Project Management Project Topics with Materials:

ABSTRACT Generally, the success of completing any building construction project is based on key performance indices such as timely delivery of project, construction period, defects as well as client satisfaction. However, what effect does the implementation of safety management practices has on building construction project success? This research... Continue Reading
  • Type:Project
  • ID:PRM0053
  • Pages:34
  • Reference:YES
1.0 INTRODUCTION TO A report means to bring back, as an answer; to announce in return; to relate as what has been discovered by a person sent to examination, explore, or investigate; as Engineers reports their work or experiment. We hope that you found what you do in these communication courses stimulating, challenging and most of... Continue Reading
  • Type:Project
  • ID:PRM0052
  • Pages:39
  • Reference:YES
ABSTRACT This research project “Network Analysis as an effective maintenance planning tool” created a detailed evaluation of strategies and techniques for planning maintenance activities in the Nigerian process industry, laying focused emphasis on operations of Warri Refinery and the effectiveness of CPM Network analysis. A review of previous... Continue Reading
  • Type:Project
  • ID:PRM0051
  • Pages:78
  • Reference:YES
ABSTRACT This study focuses on the  Assessment of strategic planning practices on organisational performance of selected banks in Ondo state, Nigeria. The objectives of this study are: to examine how strategic planning affects organizational performance, to assess the current strategic planning being implemented by the selected banks and to... Continue Reading
  • Type:Project
  • ID:PRM0050
  • Pages:89
  • Reference:YES
ABSTRACT This study focuses on the assessment of  power projects delivery in South-South of Nigeria. The objectives of this study are: to examine the various project delivery systems (PDS) used in power industry, to investigate  the impact of power project delivery system on the industrial needs in  south-south, to investigate factors... Continue Reading
  • Type:Project
  • ID:PRM0049
  • Pages:84
  • Reference:YES
The six year insurgency across the North-Eastern part of the country has triggered serious security instability and escalated the food security situation in the Northeast. With the return of relative peace in many communities in Borno state, the returnee IDPS are confronted by challenge of livelihood considering the fact that they are... Continue Reading
  • Type:Project
  • ID:PRM0048
  • Pages:15
  • Reference:YES
ABSTRACT   This research was carried out to assess and establish the criteria used by consultants in prequalifying and selecting Mechanical and Electrical subcontractors in building projects in Nigeria. Field survey involving construction consultants and staff in the client organizations in Lagos was conducted. Data were collected with the aid of... Continue Reading
  • Type:Project
  • ID:PRM0047
  • Pages:2
  • Reference:YES
This is a business case on how to establish a cyber cafe.... Continue Reading
  • Type:Project
  • ID:PRM0046
  • Pages:10
  • Reference:YES
                                                           ABSTRACT Donors play a very crucial role in the social development process in all the spheres of the world. They are particularly vital in situations where state funds are limited, political situations are fluid and volatile, natural disasters resulting from... Continue Reading
  • Type:Project
  • ID:PRM0045
  • Pages:100
  • Reference:YES
ABSTRACT This research project “Network Analysis as an effective maintenance planning tool” created a detailed evaluation of strategies and techniques for planning maintenance activities in the Nigerian process industry, laying focused emphasis on operations of Warri Refinery and the effectiveness of CPM Network analysis. A review of previous... Continue Reading
  • Type:Project
  • ID:PRM0044
  • Pages:80
  • Reference:YES
ABSTRACT This study was carried out on the factors that influence the choice of inventory control methods in organization. The specific objectives were to determine how Organization policy, Information Technology and employee competency influence the choice of inventory control methods. The study was conducted at Menengai Oil Company Nakuru .The... Continue Reading
  • Type:Project
  • ID:PRM0043
  • Pages:54
  • Reference:YES
 ABSTRACT   The  construction  industry  is  known  to  be  highly  fragmented  in  that  it  requires  the  inputs  of numerous parties to deliver a project. The fragmentation of the construction process necessitates effective integration of the numerous parties and the major tool for achieving this integration is effective... Continue Reading
  • Type:Project
  • ID:PRM0042
  • Pages:96
  • Chapters:5
  • Methodology:Statistical Analysis
  • Reference:YES
ABSTRACT This study undertakes a critical analysis of risk management as a formal technique for managing risks in project execution. It specifically probes into the proximate sources of risk into construction projects in Nigeria, the level of awareness and use of the technique amongst Nigerian construction professionals with a view to properly... Continue Reading
  • Type:Project
  • ID:PRM0041
  • Pages:138
  • Reference:YES
ABSTRACT The study was conducted to appraise the impact of Micro Projects Programme of European Union (MPP6) in Abia State on the living standard of the people. The introduction on the activities of micro projects programme in the Nine States of the Niger Delta tagged MPP3 and MPP6 respectively were traced. Attempt was made to review related... Continue Reading
  • Type:Project
  • ID:PRM0040
  • Pages:94
  • Reference:YES
ABSTRACT   This study is designed to evaluate quality management in mechanical construction projects in the oil and gas industry. This evaluation was done by assessing quality assurance, quality control and planning. Three hypotheses were postulated to answer research questions. The study adopted an audit method as an appraisal strategy. To this... Continue Reading
  • Type:Project
  • ID:PRM0039
  • Pages:125
  • Reference:YES
ABSTRACT    This study is designed to evaluate quality management in mechanical construction projects in the oil and gas industry. This evaluation was done by assessing quality assurance, quality control and planning. Three hypotheses were postulated to answer research questions. The study adopted an audit method as an appraisal strategy. To... Continue Reading
  • Type:Project
  • ID:PRM0038
  • Pages:125
  • Chapters:5
  • Methodology:Statistical Analysis
  • Reference:YES
ABSTRACT  This study investigates the critical success factors of TQM project implementation in the Nigerian banking industry as a strategy for improving the quality of service delivery to customers.  In carrying out the study primary data were used and a combination of Factor and regression analytical tools was used in the analysis. The... Continue Reading
  • Type:Project
  • ID:PRM0037
  • Pages:82
  • Reference:YES
ABSTRACT    In this study research, we have examined the Project Evaluation and Review Technique, PERT and the Critical Path Method CPM/Critical Path Analysis. CPA as Project Management tools, among others, and applied them to study the Electrical and Mechanical services contract of the School of Health Technology Building Project, FUTO, using... Continue Reading
  • Type:Project
  • ID:PRM0036
  • Pages:226
  • Reference:YES
This study undertakes a critical analysis of risk management as a formal technique for managing risks in project execution. It specifically probes into the proximate sources of risk into construction projects in Nigeria, the level of awareness and use of the technique amongst Nigerian construction professionals with a view to properly situating... Continue Reading
  • Type:Project
  • ID:PRM0035
  • Pages:138
  • Reference:YES
ABSTRACT The study was conducted to appraise the impact of Micro Projects Programme of European Union (MPP6) in Abia State on the living standard of the people. The introduction on the activities of micro projects programme in the Nine States of the Niger Delta tagged MPP3 and MPP6 respectively were traced. Attempt was made to review related... Continue Reading
  • Type:Project
  • ID:PRM0034
  • Pages:94
  • Reference:YES
ABSTRACT Most of the houses in Mombasa County are poorly constructed and without approved plans by Municipal Council of Mombasa and there are no urban plans for the structures constructed which makes Mombasa as a city surrounded by many shanty structures in the estates. In recent years, a number of financial institutions have encouraged the... Continue Reading
  • Type:Project
  • ID:PRM0033
  • Pages:49
  • Reference:YES
ABSTRACT Monitoring and Evaluation over time have gained traction and become fundamental components in projects. Most internal evaluations are based on the assumption that evaluators are independent and do not bow to different forms of influence. Literature however reveals cases of evaluators being confronted by stakeholders to either alter or... Continue Reading
  • Type:Project
  • ID:PRM0032
  • Pages:83
  • Reference:YES
ABSTRACT  There has been poor performance of road contract due to diverse challenges such as poor management of funds and poor delivery of services to the road user. In addition, the performance measurement systems aren’t efficient or effective to overcome this problem. Road contractor’s performance problem appears in many aspects, ranging... Continue Reading
  • Type:Project
  • ID:PRM0031
  • Pages:100
  • Reference:YES
ABSTRACT Incidents of poor performance of community projects have been documented by various research studies. Many projects encounter delays in implementation, poor quality of projects, time and cost overruns that affect the overall achievement of project objectives (Ramathan et al., 2012). The major problem being that introduction of technology... Continue Reading
  • Type:Project
  • ID:PRM0030
  • Pages:102
  • Reference:YES
ABSTRACT The study was conducted to investigate the effect of conflicts on project team productivity at Mastermind Tobacco Kenya Limited in order to build everlasting coexistence of members of a project team and ensure attainment of project as well as overall organizational goal. The objectives of this study were: to examine the effects of project... Continue Reading
  • Type:Project
  • ID:PRM0029
  • Pages:80
  • Reference:YES