Quantity Surveying Project Topics with Materials:

  CHAPTER ONE 1.0     INTRODUCTION The dictionary definition of trends simply means “to move or extend in a specific direction” (Long Man Family Dictionary) also trends simply means “a general direction in which a situation is changing or developing” (Advance Learner’s Dictionary). Leaning on, this definition of “trends” thus the... Continue Reading
  • Type:Project
  • ID:QUS0040
  • Pages:65
  • Chapters:5
  • Methodology:Statistical Analysis
  • Reference:YES
  ABSTRACT This research assesses the factors mitigating the effective preparation of cost estimates at the design stage Accurate cost estimates are crucial to the effrctive realization of construction projects. This research is aimed at examining the factors affecting accuracy of pre-lender cost estimate in Abuja, with a view to improving the... Continue Reading
  • Type:Project
  • ID:QUS0039
  • Pages:65
  • Chapters:5
  • Methodology:Statistical Analysis
  • Reference:YES
  ABSTRACT The aim of this research is to analyzed and compare the life cycle cost of alternative root covering materials, Zink coat roofing sheet materials, corrugated Asbestos cement roofing materials, concrete decked roof materials, and long span aluminum roofing materials were considered in this research work with the objectives to determine... Continue Reading
  • Type:Project
  • ID:QUS0038
  • Pages:65
  • Chapters:5
  • Methodology:Scientific Method
  • Reference:YES
  ABSTRACT The main Aim of this research is to investigate the Adoption of knowledge management in the Nigeria construction industry. The research examined the area of the construction industry that will improve as a result of the contribution of knowledge management. Data for the analysis were collected through questionnaire Administration on... Continue Reading
  • Type:Project
  • ID:QUS0037
  • Pages:65
  • Chapters:5
CHAPTER ONE 1.0   INTRODUCTION As-built survey has been an essential element in the development of the human environment since the beginning of recorded history. It is performed to verify that a particular improvement on a parcel of land has been built according to the proposed design plans, specifications and setback requirement. It shows how... Continue Reading
  • Type:Project
  • ID:QUS0036
  • Pages:65
  • Chapters:5
CHAPTER ONE INTRODUCTION 1.1   BACKGROUND TO THE STUDY The construction industry has recently witnessed a paradigm shift from traditional paper-based method of service delivery to electronic information exchange using Information Technology (IT), at least in the western world like UK. It is now evident that the adoption of Information Technology... Continue Reading
  • Type:Project
  • ID:QUS0035
  • Pages:65
  • Chapters:5
CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Shash (1993) explains that a construction company can either negotiate with the client or use a competitive tendering process to obtain a contract. Fu and Drew (2002) suggest that competitive tendering is the most common method used for contractor selection. In competitive tendering process, a... Continue Reading
  • Type:Project
  • ID:QUS0034
  • Pages:65
  • Chapters:5
CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Time impacts are inevitable on construction projects, primarily because of the uniqueness of each project and the limited resources of time and money that can be spent on planning, executing and delivering the project.  Time factors are inherent... Continue Reading
  • Type:Project
  • ID:QUS0033
  • Pages:65
  • Chapters:5
THE EFFECT OF MOTIVATION OF LABOUR COST AND PRODUCTIVITY ON NIGERIA CONSTRUCTION INDUSTRY ABSTRACT Motivation is considered as an important tool for enhancing worker’ productivity. Construction sector is not an exception. It has been empirically established that motivation has positive impact on construction worker’s productivity. Moreover,... Continue Reading
  • Type:Project
  • ID:QUS0032
  • Pages:73
  • Chapters:5
  • Methodology:Chi Square
  • Reference:YES
CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Quantity surveying is concerned with controlling and managing construction projects. The Nigerian construction industry is faced with uncertainties. With construction targets not being met and high rate of abandoned construction projects, there is great need for proper risk assessment and... Continue Reading
  • Type:Project
  • ID:QUS0031
  • Pages:65
  • Chapters:5
CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Until relatively recently, the discipline of development appraisal has remained the provenance of surveyors and developers. It largely been ignored by other participants in the development process, particularly planners, architects and construction specialists. This is now changing. Close... Continue Reading
  • Type:Project
  • ID:QUS0030
  • Pages:65
  • Chapters:5
Background to the Study The acronym GIS stands for geographic information system, it is a system which allows a capture, updating and displaying of a number of previously unconnected dataset bringing them into a common reference system for spatial analysis from which relationship can be identified and decisions made (Sowton... Continue Reading
  • Type:Project
  • ID:QUS0029
  • Pages:65
  • Chapters:5
CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY It is a paradox that Nigeria is a rich country inhabited by the poor. Her poverty profile in statistical figures according to a recent study indicates that Nigeria is poverty endemic. Poverty incidence increased between 1980 and 1985 and between 1992 and 1996. The trend also shows that there has... Continue Reading
  • Type:Project
  • ID:QUS0028
  • Pages:65
  • Chapters:5
CHAPTER ONE INTRODUCTION 1.1   BACKGROUND TO THE STUDY Organizational culture defines the way employees complete tasks and interact with each other in an organization. The cultural paradigm comprises various beliefs, values, rituals and symbols that govern the operating style of the people within a company. Corporate culture binds the workforce... Continue Reading
  • Type:Project
  • ID:QUS0027
  • Pages:65
  • Chapters:5
CHAPTER ONE 1.0   INTRODUCTION As-built survey has been an essential element in the development of the human environment since the beginning of recorded history. It is performed to verify that a particular improvement on a parcel of land has been built according to the proposed design plans, specifications and setback requirement. It shows how... Continue Reading
  • Type:Project
  • ID:QUS0026
  • Pages:65
  • Chapters:5
CHAPTER ONE INTRODUCTION 1.1   BACKGROUND TO THE STUDY The construction industry has recently witnessed a paradigm shift from traditional paper-based method of service delivery to electronic information exchange using Information Technology (IT), at least in the western world like UK. It is now evident that the adoption of Information Technology... Continue Reading
  • Type:Project
  • ID:QUS0025
  • Pages:65
  • Chapters:5
ABSTRACT This study is focused on the “effect of population growth on land resources development”. A case study in Aba urban of Abia state. It is a comprehensive research on the course of population growth problems, and benefits of the growth on land development. There is no doubt that at present, there is link between development and... Continue Reading
  • Type:Project
  • ID:QUS0024
  • Pages:65
  • Chapters:5
ABSTRACT In the public procurement system in Nigeria has over the years been abused leading to cost inflation, delay in project delivery, poor quality of work, and project abandonment. The aim of this study is to examine the impact of the due process policy on construction projects delivery in Nigeria. Data were collected using a structured... Continue Reading
  • Type:Project
  • ID:QUS0023
  • Pages:65
  • Chapters:5
A SURVEY OF THE EFFECT OF MORTGAGE INSTITUTIONS IN THE PROVISION OF AFFORDABLE AND SUSTAINABLE HOUSING IN NIGERIA CHAPTER ONE 1.0     INTRODUCTION 1.1     BACKGROUND OF THE STUDY: Housing provides more than shelter for man because it encompasses all social services and utilities that are needed for a livable environment in order for any... Continue Reading
  • Type:Project
  • ID:QUS0022
  • Pages:87
  • Chapters:5
ABSTRACT The construction sector occupies a focal position in the economy of any nation because it is an important contributor to the process of development (Aje, 2008). In the conduct of economic activities, the construction sector is always used by government as the stimulus for the buoyancy of the economy (Akindoyemi, 2011). The construction... Continue Reading
  • Type:Project
  • ID:QUS0021
  • Pages:65
  • Chapters:5
ABSTRACT Several studies on construction craft skills have identified a number of problems including ineffective training as responsible for shortages of craftsmen in the construction industry. In Nigeria, the problem of training craftsmen has been attributed to lack of a harmonised training framework. This research therefore examined existing... Continue Reading
  • Type:Project
  • ID:QUS0020
  • Pages:65
  • Chapters:5
ABSTRACT Th e  source and nature of output constants used for preparation of construction estimates should be accurate and reliable for the client to have confidence on the prepared estimates. This research is focused on using time study approach to empirically determine the outputs of block laying work items inconstruction industry. The study... Continue Reading
  • Type:Project
  • ID:QUS0019
  • Pages:67
  • Chapters:5
CHAPTER ONE 1.0               INTRODUCTION 1.1               Background to the Study The Construction industry in Nigeria, although generally accepted as very active, is relatively small contributing only about 1.8% to 3% to the Nigeria‟s Gross Domestic Product (NBS, 2013). The industry provides employment opportunity... Continue Reading
  • Type:Project
  • ID:QUS0018
  • Pages:67
  • Chapters:5
ABSTRACT Performance measurement is crucial to the construction industry in order to improve the performance of the industry and most importantly achieve continuous improvement. The traditional approach to performance measurement has been criticised severally resulting to an evolution that brought about contemporary performance measurement... Continue Reading
  • Type:Project
  • ID:QUS0017
  • Pages:65
  • Chapters:5
ABSTRACT Government at all levels are forced to prioritise and restrict public expenditures due to budget deficits and the inefficient management of large infrastructure projects. Due to the shortage of resources for healthcare delivery leading to decline in the quality of care, there is considerable interest in PPP initiatives for the provision... Continue Reading
  • Type:Project
  • ID:QUS0016
  • Pages:65
  • Chapters:5