FACTORS INFLUENCING THE COST PLANNING OF A PUBLIC BUILDING PROJECT

  • Type: Project
  • Department: Estate Management
  • Project ID: ETM0183
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 90 Pages
  • Methodology: Statistical Analysis
  • Reference: YES
  • Format: Microsoft Word
  • Views: 1.8K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853




ABSTRACT





The

importance of accurate estimate during the early stage of cost planning of

capital project has been widely recognized for many years. Even so, very few

quantitative method are available that enable estimators and business managers

to objectively evaluate the accuracy of early estimates and planning. The

primary purpose of this study was to identify and examine the factors

influencing cost planning of building project in Gombe and Bauchi State as it

relates to the Nigerian Construction Industry. To accomplish this aim,

quantitative data were collected from consultant Quantity Surveyors. Each of

the respondents was asked to assign a one to ten rating for each of the 10

potential drivers of the estimates accuracy for a given estimate. The data were

analyzed using simple statistical tools which include; mean, standard deviation

and percentages were used to represent the information. The study analysis

identified 5 of the 10 factors that were most significant at the level. In this

finding the five factors, in order of significance were most significance

amount of information available, time allowed  to prepare the estimate,

experience of the consultant team, complexity of the project, and bidding and

suitability/stability of the market. Cost estimating and planning is

fundamental part of the construction. The success or failure of a project is

dependent on the accuracy of several estimates throughout the course of the

project. Construction estimating is the compilation and analysis of many items

that influence and contribute to the cost of the project. Estimating which is

done before the physical performance of the work requires a detailed study and

careful analysis of the bidding document, in order to achieve the most accurate

estimate possible of the probable cost consistent with the bidding time available

and the accuracy and completeness of the information submitted. Overestimated

or underestimated cost has the potential to cause loss to local contracting

companies





 





TABLE OF

CONTENTS





 





DEDICATIONDEDICATION 





ACKNOWLEDGEMENT       





TABLE OF CONTENTS         





CHAPTER ONE: INTRODUCTION   





1.1BACKGROUND OF THE STUDY





1.2   STATEMENT OF THE

RESEARCH PROBLEM





1.3RESEARCH QUESTIONS 





1.4SIGNIFICANCE OF THE STUDY 





1.5.0    AIM AND OBJECTIVES        





1.5.1    AIM    





1.5.2 OBJECTIVES    





1.6STATEMENT/RESERCH OF

HYPOTHESIS         





1.7   RESEARCHMETHODOLOGY  





1.7.2 QUESTIONNAIRE/FIELD SURVEY    





1.8SCOPE AND LIMITATION          





1.8.1SCOPE    





1.8.2LIMITATION     





CHAPTER TWO         





LITERATURE REVIEW         





2.1       HISTORICAL DEVELOPMENT OF COST PLANNING        





2.2.0CONCEPT OF COST PLANNING          





2.2.1 ADVENT OF COST PLANNING          





2.2.2USES OF COST PLANNING      





2.2.3  Cost Planning the

Brief 





2.2.4  PRELIMINARY COST

PLANNING     





2.2.5    Cost Planning Reports 





2.2.6    THE ROLE OF

THE COST PLANNER          





2.3.0    COST PLANNING TECHNIQUES     





2.3.1    VARIOUS COST PLANNING TECHNIQUES           





2.3.1.1 Easy Cost Planning (ECP)       





COST PLANNING     





2.5.2  ELEMENTAL ESTIMATES      





The cost plan  





2.7.1.2.1          ELEMENTAL COST ANALYSIS       





2.7.1.2.2          PREPARATION OF ELEMENTAL COST PLAN       





2.7.1.3    PHASE 3 –

COST CHECKING       





2.7.2      

 COMPARATIVE COST PLANNING         





2.7.2.1  PHASE I – ESTIMATE          





2.7.2.2 PHASE 2 – COST PLAN       





2.8.0    COST IN USE –

THEORY     





2.8.1    COST IN USE

AND COST PLANNING         





2.9.0     NEED FOR COST

ESTIMATING      





2.9.1    COST

ESTIMATING PRIOR TO TENDER    





2.9.2   SINGLE PRICE RATE

ESTIMATING 





2.10.0  COST CONTROL       





2.10.1 DEFINITION OF COST CONTROL   





2.10.1.1      COST

ANALYSIS           





2.10.1.2           COST RESEARCH     





2.10.1.3           COST STUDY





2.11.0  COST PLAN   





2.12.0              APPROXIMATE ESTIMATING         





2.7.12.0           FACTORS INFLUENCING COST PLANNING OF PUBLIC  

BUILDING PROJECTS         





2.12.1 LOCATION FACTORS          





2.12.2 DESIGN FACTORS    





2.12.3 QUALITATIVE FACTORS    





2.12.4 TIME FACTORS        





2.12.4.1           PROJECT COMPLEXITY      





2.12.4.2           AVAILABILITY/AMOUNT OF PROJECT INFORMATION 





2.12.4.3           TECHNOLOGICAL REQUIREMENTS          





2.12.4.4           CONTRACT REQUIREMENT/ STAGE OF WORK   





2.12.4.5           TEAM'S/CONTRACTOR'S/CONSULTANT'S EXPERIENCE AND EFFICIENCY    





2.12.4.6           MARKET REQUIREMENT/STABILITY OF THE MARKET 





2.13.0  FACTORS AFFECTING COST ESTIMATE /PLAN   





2.13.1  Cost Information        





2.13.2    MARKET

INFORMATION  





2.13.3    EXPERIENCE OF

Q.S. / ESTIMATOR         





2.15.0. FACTORS IN SUCCESSFUL COST PLANNING      





2.16.0 DESIGN METHOD AND COST ADVICE     





2.16.1  THE RIBA PLAN OF

WORK 





2.17.0  COST DATA  





2.17.1   PROBLEMS WITH

COMPUTER MODELS  





2.17.2   THE USES OF COST

DATA 





2.18.0   COST PLANNING

SERVICES          





2.18.1  FEASIBILITY STUDIES        





2.18.2   FUNCTIONAL PROGRAM   





2.18.3   SCHEMATIC DESIGN          





2.18.4  DESIGN DEVELOPMENT (PRELIMINARY DRAWINGS    





2.18.5    

 WORKING DRAWINGS    





2.18.6   PRE TENDER





2.18.7  TENDER PACKAGE 





2.18.8   TENDER REVIEW &

CONTRACTOR SELECTION





2.18.9    FUNCTIONAL

COST ANALYSIS   





CHAPTER THREE     





RESEARCH METHODOLOGY         





3.3   INSTRUMENT FOR DATA

COLLECTION       





3.4   PROCEDURE FOR DATA

COLLECTION         





3.4       METHOOD OF DATA ANALYSIS    





3.5       SOURCES OF DATA





3.5.1    PRIMARY SOURCES OF DATA       





3.5.1.1             RESEARCH QUESTIONNAIRES      





Section A - Organisation

Information 





Section B – Questions On Cost

Planning        





Section C – Comments And

Suggestions        





3.5.2    SECONDARY DATA

COLLECTION





CHAPTER FOUR       





DATA PRESENTATION AND ANALYSIS   





4.1    

 PRESENTATION OF DATA FROM QUESTIONNAIRE        





4.1.1   STRUCTURE OD

QUESTIONNAIRE 





4.2     TESTING OF

HYPOTHESES   





4.3 RESEARCH FINDING     





CHAPTER FIVE         





SUMMARY, CONCLUSION AND

RECOMMENDATION   





5.0       SUMMARY    





5.1       CONCLUSION           





5.2       RECOMMENDATIONS        





5.3       CONTRIBUTION TO KNOWLEDGE           





REFERENCES





APPENDIX     

FACTORS INFLUENCING THE COST PLANNING OF A PUBLIC BUILDING PROJECT
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Estate Management
  • Project ID: ETM0183
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 90 Pages
  • Methodology: Statistical Analysis
  • Reference: YES
  • Format: Microsoft Word
  • Views: 1.8K

500
Leave a comment...

    Related Works

    ABSTRACT The importance of accurate estimate during the early stage of cost planning of capital project has been widely recognized for many years. Even so, very few quantitative method are available that enable estimators and business managers to objectively evaluate the accuracy of early estimates and planning. The primary purpose of this study... Continue Reading
    ABSTRACT The importance of accurate estimate during the early stage of cost planning of capital project has been widely recognized for many years. Even so, very few quantitative method are available that enable estimators and business managers to objectively evaluate the accuracy of early estimates and planning. The primary purpose of this study... Continue Reading
      ABSTRACT The main aim of this research work is to compare the factors affecting cost of industrialized building and conventional building system in Nigeria. The research method used in collecting data was through the use of questionnaire administered to construction professionals in Nigerian construction industry. Seventy questionnaires were... Continue Reading
    ABSTRACT Construction works estimate inaccuracies and none performance have made the imprecise cost estimating practice subjective. This study assessed the dimensions of cost estimating risks influencing building projects’ estimates. The objectives were to identify sources of cost estimating risks; determine critical risk influencing building... Continue Reading
    ABSTRACT Construction works estimate inaccuracies and none performance have made the imprecise cost estimating practice subjective. This study assessed the dimensions of cost estimating risks influencing building projects’ estimates. The objectives were to identify sources of cost estimating risks; determine critical risk influencing building... Continue Reading
    ABSTRACT The study was carried to critically investigate the analysis of factors influencing material wastage on building sites in Kaduna State. To achieve this objective, three research questions were stated to guide this study. The data collected were analyzed using descriptive statistics, tables and graph to analyze research questions. A... Continue Reading
    Chapter one Introduction 1.1. Background of the Study Construction industry has complexity in its nature because it contains a large number of parties such as clients, contractors, consultants, stakeholders, shareholders, regulators and others. Construction projects in the Gaza Strip suffer from many problems and complex issues in performance,... Continue Reading
    ABSTRACT The study determined the factors that influence students' performance in writing entrepreneurship project proposals. The study focused on learning facilities, role of administrators like principals, teacher qualifications, size of the class, role of Kenya National Examinations Council and effects of participation of students in home... Continue Reading
    ABSTRACT The purpose of this study is to find out the factors that influence the attitudes of women towards family planning in Egor Local Government Area of Edo State. Specifically, the study attempts to find out the influence of education, health, religion, culture, age of women... Continue Reading
    ABSTRACT           The purpose of this study is to find out the factors that influence the attitudes of women towards family planning in Egor Local Government Area of Edo State.  Specifically, the study attempts to find out the influence of education, health, religion, culture, age of women and income on the attitudes of women towards... Continue Reading
    Call Us Get this work